Difference between revisions of "Mesh Boston Meeting Minutes - 2022/04/03"

Jump to navigation Jump to search
Line 32: Line 32:
  
 
Discussion of wiring public housing.
 
Discussion of wiring public housing.
 +
 +
Still verifying whether May 8th is a good date for a meetup?

Revision as of 11:32, 3 April 2022

Attending

  • JacobS
  • JamesO
  • Skyler

Action Item Status

  • Write script to update map/liveliness (Skyler)
  • Talk with friends about reaching out to Worcester Maker Space (Skyler)
  • Reach out to UMB CS department about the helping with the project (Lucas)
  • Get node running on a VM on a PC (Lucas)
  • Get incorporation paperwork drafted (JamesO)
  • Setup exit node (JamesO)
  • Contacting Metropolitan Area Planning Council (MAPC) about our efforts (James)

Equipment Available

See Donating equipment.

Discussion

Summary

Skyler has poster designs for us to review. Shared to the outreach channel.

JamesO reached out to friend helping with incorporation.

Reviewed hardware JamesO picked up last Sunday from Stephen. See Donating equipment.

JamesO talked with MAPC contact about their efforts to bring Internet to public housing in Chelsea, Everett and Revere. Said we would be willing to work with them.

Discussion of wiring public housing.

Still verifying whether May 8th is a good date for a meetup?