Mesh Boston Meeting Minutes - 2022/07/31

Revision as of 11:14, 31 July 2022 by Jokeefe (talk | contribs) (Created page with "== Attending == * Lex * Skyler * James * Lucas * Jacob == Action Item Status == * Outreach ** Talk with friends about reaching out to Worcester Maker Space (Skyler) * Reach...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Attending

  • Lex
  • Skyler
  • James
  • Lucas
  • Jacob

Action Item Status

  • Outreach
    • Talk with friends about reaching out to Worcester Maker Space (Skyler)
  • Reach out to UMB CS/Eng department about the helping with the project (Lucas)
  • Poll for better meeting time (Lucas)
  • System Maintenance
    • Write script to update map/liveliness (Skyler)
    • Clear up old entries in map/grafana (JamesO)
    • Setup exit node (JamesO)
  • Organization
    • File incorporation paperwork (JamesO)

Future

  • Check on Cisco Meraki network in Boston in a few weeks

Equipment Available

Discussion

Summary

Lex showed some logo designs. Skyler will photograph t-shirt design and send to Lex.

Lucas will send out the poll to massmesh riseup list. JamesO will signal boost in weekly email/matrix.

James followed up on incorporation. Will drop by friend's house this week.

Compared Open Collective with Action Network. Poked around and decided on Action Network. Skyler will work on expanding it and will send out the first announcement email.

Trolls disrupted our video chat. Moved to another Jitsi room and enabled lobby. Will need to turn on security at the start of the session or find something else.

Retire use of massmesh riseup list.

Table at MIT Swap Fest 8/21

  • Volunteer Form;
  • James will mail in form and payment ahead of time;
  • Test MeshNet two node setup on 8/20, noon-2pm, JamesO's house;
  • Skyler will setup first email announcement as part of the Action Network setup;
  • Lex will see if he can update flyer with a QR code for sign up form;
  • Plan to:
    • pick color for table cloth, but keep it logo-free for now;
    • more flyers;
    • have a signup tablet;
    • two nodes to demonstrate with power for nodes or very long extension cords;
    • We may have an infographic on setting up a node.